Urban Regeneration · Architecture · 4 min read

How does the architectural process work in urban regeneration?

Short answer: Urban regeneration starts when a building is officially designated a risky building. The owners then make a decision, the plot's zoning is analysed and an allocation model is set up that determines who receives what in the new building. The architectural design is the basis of this model: the number, size and location of the apartments are fixed on the drawings; then the permit is obtained and construction begins.
Fatih Urban Regeneration Project, Sönmez Design

What are the steps?

In building-by-building regeneration under Türkiye's Law No. 6306, technical, legal and design steps run in parallel. Because the legislation and implementing rules are updated over time, the provisions in force should be confirmed at every step.

01Risk assessmentlicensed firm02Owners' decisionmajority + agreement03Zoning analysisFAR, height04Architectureallocation table05Permit & builddemolish, build
Diagram — The architectural design is the step that turns the owners' agreement into actual apartments.
StepWhat happensWho does it
Risky building assessmentCore and reinforcement data are taken from the building, its seismic performance is calculated and the report is submitted to the authorityFirms licensed by the Ministry
Owners' decisionThe flat owners decide on rebuilding and the methodFlat owners; legal adviser if needed
Zoning analysisThe plot's FAR, height limit, setbacks and parking requirement are studiedArchitect
Allocation model and designThe units in the new building are designed and it is decided which owner receives which apartmentArchitect, owners and contractor, if any
PermitArchitectural and engineering drawings are approved; demolition and building permits are obtainedDesign team, relevant authority
Construction and handoverConstruction, building inspection, occupancy permit and condominium registrationContractor, building inspection firm

How does the design affect the allocation?

The biggest source of disagreement in regeneration is who gets which apartment in the new building. That question can only be answered through the architectural design. The same FAR can produce four large apartments or six small ones; differences in façade, floor and orientation change the value of each unit. A good regeneration project balances:

  • Protection of existing rights: each owner receives an equivalent or better unit for their old one.
  • Value balance: not just square metres, but a premium assessment based on floor, façade, view and plan quality.
  • Financing: planning additional units, where zoning allows, to cover the construction cost.
  • Common areas: the effect on usable area of parking, shelters, lifts and fire stairs required by current regulations.

Why won't the new building be the same as the old one?

Owners often expect an exact copy of their old apartment. But the new building must comply with the current zoning plan and with seismic, fire, parking and accessibility regulations. Setbacks, lift and fire-stair requirements or a changed FAR can reduce net apartment areas or change the number of floors. Showing this in numbers at the very start, together with the zoning analysis, prevents disputes later on.

What owners should watch out for

  • Do not evaluate contractor offers without seeing a zoning analysis.
  • Attach the architectural drawings, room data sheets and technical specification to the contract.
  • Allocate apartments on approved floor plans, not verbally.
  • Put the handover date, late-delivery penalties and rent support terms in writing.
  • Consider the geotechnical survey and structural design together with the architectural design.
FAQ

Frequently asked questions

How does the urban regeneration process start?

It starts when one of the flat owners applies and a licensed firm carries out a risky building assessment. The report is submitted to the relevant authority and, once approved, an annotation is added to the title deed.

How many owners must approve the regeneration decision?

Under the current rules, the decision is taken by an absolute majority of owners in proportion to their shares. As legislation can change, the current provision should be confirmed at the decision stage.

Will my apartment be smaller in the new building?

It may be. The current zoning plan, setbacks and requirements for lifts, fire stairs and parking affect the net area. The exact result comes from the zoning analysis and the architectural design.

When should the architect get involved?

Before the contract with the contractor is signed. A zoning analysis and preliminary design let the owners see what they are negotiating.

What is the allocation based on?

Existing land shares and the value of the units. Differences in floor, façade and size between the new apartments are balanced through a premium assessment.

Does Sönmez Design have urban regeneration experience?

Yes. The Fatih and Güngören urban regeneration projects are among the selected works of our Istanbul-based office.

Let's plan your building's regeneration project together.

Drawing on our urban regeneration projects in Fatih and Güngören, we manage the process from zoning analysis to permit in one place. You can browse our projects.