How does the architectural design process work?

Short answer: An architectural project moves through six stages: brief and zoning analysis, concept design, schematic design, permit drawings, construction documents and the tender package. Each stage develops the decisions of the previous one in more detail, and the next stage only begins once the client has signed off.
Firuzköy Mixed-Use Project, Sönmez Design

Why does an architectural project progress in stages?

Not every decision about a building can be made at once. First, what the plot allows and what the client needs become clear; then come massing and plans, and after that materials and details. When this order is broken, for example when the plan changes after the permit has been issued, both time and cost multiply. Working in stages means expensive decisions are made while they are still cheap to change.

01Brief & zoningneeds + plot02Conceptmassing, idea03Schematic designplan, section, façade04Permit drawingsauthority approval05Construction + tenderdetails, quantities
Diagram — Client approval is obtained at the end of each stage; approved decisions are the input to the next stage.

Stages and deliverables

StageWhat happensDeliverables
1. Brief and zoning analysisThe plot's zoning status, FAR, height and setbacks are studied; the client's space and use requirements are listedBrief, zoning analysis report, area schedule
2. Concept designAlternatives for massing, layout and the main idea are developedSite plan sketches, massing studies, 3D visuals
3. Schematic designThe chosen concept is turned into plans, sections and elevations; key structural and MEP decisions are made1:200 or 1:100 plans, sections, elevations, material proposal
4. Permit drawingsThe design is brought into line with regulations and submitted to the authority together with the engineering drawingsApproved architectural, structural, electrical and mechanical drawings; building permit
5. Construction documentsHow the building will be built is drawn with every dimension and detail1:50 plans, system and junction details, room data sheets
6. Tender packageEnables comparable bids from contractorsBill of quantities, cost estimate, technical specification, tender drawings

Decisions the client needs to make

  • Brief: which uses, how many units, of what size? While this stays vague, the design cannot progress.
  • Budget and quality level: materials and systems are chosen according to the budget, so it should be shared from the start.
  • Schedule: target dates for the permit and the start of construction set the length of each stage.
  • Approvals: written sign-off at the end of each stage reduces the cost of later changes.

When do the engineering disciplines join?

Structural, electrical and mechanical engineers should join at the schematic design stage. If column grids, floor-to-floor heights, shaft locations and plant rooms are not fixed at this stage, the architectural plan has to be redrawn during the permit or construction documents stage. At Sönmez Design, architectural design is coordinated with the structural, electrical and mechanical disciplines on a single BIM model using Revit and Navisworks.

How long does the process take?

It depends on the size and function of the building and on how long the authority takes to approve. For a mid-sized residential or office building, the time from concept to permit application is usually measured in months; construction documents and the tender package come on top of that. The biggest uncertainty is often not the design but the approvals, which is why getting the zoning analysis right at the very start is the step that shortens the process most.

Common mistakes

  • Starting the design without studying the zoning status in detail.
  • Leaving the engineering teams out of the process until the permit stage.
  • Treating the permit drawings as construction documents and going on site with them.
  • Collecting bids without a tender package, which makes the bids impossible to compare.
FAQ

Frequently asked questions

How many stages does an architectural project have?

Generally six: brief and zoning analysis, concept design, schematic design, permit drawings, construction documents and the tender package.

What is the difference between schematic design and permit drawings?

Schematic design is the preliminary design in which the design decisions are agreed with the client. Permit drawings are those decisions drawn in line with the regulations and submitted to the authority for approval.

Can construction start without construction documents?

Legally it can once the permit has been issued, but it is not recommended. Permit drawings do not contain the dimensions and details the site needs, so decisions get made on site and the risk of errors rises.

Does an architecture firm also prepare the engineering drawings?

It depends on the firm. Sönmez Design keeps architectural design at the centre and delivers structural, electrical and mechanical drawings within the same team, with BIM-based coordination.

What documents are needed for an architectural project?

The title deed, zoning certificate, survey plan and, if available, a geotechnical report are the basic documents. The client's brief is also needed.

What kinds of projects does Sönmez Design work on?

Residential and urban regeneration, commercial and mixed-use, mosque and interior design projects. Selected work includes the Fatih and Güngören urban regeneration projects, Firuzköy Mixed-Use, Besni Mosque and Hatay Beşyüzevler Mosque.

Let's take your project from concept to construction together.

At our office in Ataşehir, Istanbul, we run the architectural, structural, electrical and mechanical disciplines as one team. See our Services and Projects pages for details.

Website designed by Sönmez HOS Group