Data Center · Site Selection · 4 min read

How do you choose a site for a data center?

Short answer: When choosing land for a data center, the first two things to check are sufficient, redundant power and fibre connectivity over more than one route. Earthquake, flood and environmental risks, climate, access and security come next. The zoning status and room to grow determine the long-term value of the investment.
Turkcell Datacenter, a Sönmez Mühendislik reference project

Why does site selection come before design?

A mistake in the building can be fixed later; a wrong site cannot. Even the best design will not save the investment on a plot that cannot get power, carries a flood risk or has no room to grow. That is why the architectural and engineering teams should carry out a joint preliminary assessment before the land is bought.

01Power & fibrecapacity, backup02Natural risksquake, flood03Surroundingsneighbours, access04ZoningFAR, use05Layout testdo phases fit?
Diagram — If a criterion is a deal-breaker, the plot is ruled out before moving to the others.

Evaluation criteria

CriterionWhat to look atWhy it matters
PowerNearby substation, available capacity, the option of supply from two separate sourcesThe core input of a data center; connection time and cost set the investment schedule
FibreMore than one operator and physically separate routesA single route can cut off the facility with a single excavation accident
EarthquakeDistance to fault lines, soil class, liquefaction riskDirectly affects structural cost and continuity risk
Flood and waterStream beds, flood maps, groundwater levelOne of the greatest physical risks for electrical spaces
ClimateAnnual temperature and humidity distributionFree-cooling hours and energy efficiency
Water supplyContinuity, if the cooling system uses waterA water outage can affect cooling
AccessAccess for vehicles carrying heavy equipment, staff transportInstallation and emergency response times
Environmental risksAirport approach paths, fuel facilities, heavy industry, vibration sourcesRisk of external accidents and outages
Zoning and neighboursPermitted use, FAR, height, distance for generator noiseWhether a permit can be obtained, and neighbour complaints

Layout test on the plot

On a plot that passes the criteria, the next step is to draw whether the target capacity actually fits. Data halls are only part of the area; the transformer yard, generators, fuel tanks, cooling equipment, security distances, truck manoeuvring space and future phases all need room. This preliminary layout often shows that the limiting factor is not FAR but the need for open space. For the FAR concept, see our article on FAR and TAKS.

Converting an existing building into a data center

  • Floor load capacity: most office and warehouse floors are not strong enough for rack and battery loads; strengthening is needed.
  • Floor height: may not be enough for air paths and cable trays.
  • Power infrastructure: the existing connection may be far below what is needed.
  • Open space: room must be found for generators and cooling equipment.

Conversion can be quick and economical in some cases, but the decision should not be made without a structural and infrastructure survey.

Common mistakes

  • Asking about the power connection after buying the land.
  • Thinking only about the first phase and leaving no room to grow.
  • Trying to offset flood and soil risk with a cheap land price.
  • Ignoring the effect of generator noise and exhaust on neighbours.

We explain how the building itself is organised in our article on data center architectural design.

FAQ

Frequently asked questions

What is the most important criterion in data center site selection?

Sufficient, redundant power and fibre connectivity over more than one route. If these two cannot be secured, no other advantage will save the investment.

Can a data center be built in an earthquake zone?

Yes, but soil conditions, the structural system, equipment anchorage and, if needed, seismic isolation are built into the design. Proximity to a fault line and liquefaction risk can rule out a plot.

How much land does a data center need?

It depends on capacity. Space is needed not only for data halls but also for transformers, generators, cooling equipment, security distances and future phases.

Can an existing building be converted into a data center?

In some cases, yes. The decision is made after surveying floor load capacity, floor height, power infrastructure and the availability of open space.

Why does climate matter?

In cool, dry climates there are more hours when outside air can be used for free cooling, which lowers the facility's energy use and operating costs.

Who carries out the site selection study?

A team of architects and electrical, mechanical and structural engineers working together. Sönmez Design carries out this work jointly with its group company Sönmez Mühendislik.